02.1
Our own fleet.
140 haulers, 38 tower cranes and 220 pieces of earth-moving plant — owned, maintained and dispatched by us. No rental queues between the plan and the pour.
Ironridge
000
Surveying site · loading fleet
Infrastructure · Commercial · Since 1987
Highways, bridges, towers and campuses. Ironridge surveys, hauls, excavates and frames the structures cities grow around — with our own fleet, our own crews, and one accountable team.
Phase 02 — Haul
02.1
140 haulers, 38 tower cranes and 220 pieces of earth-moving plant — owned, maintained and dispatched by us. No rental queues between the plan and the pour.
02.2
Every load is sequenced against the crane schedule. Steel arrives the morning it's lifted — never the week before, never the hour after.
0M
Tonnes of material moved last year
Phase 03 — Excavate
Phase 04 — Frame
Riverside Tower · structural record
A four-day floor cycle with self-climbing core formwork. The crane you're watching lifts 6.4 tonnes at a 46-metre reach.
Phase 05 — Engineer
01
Drone photogrammetry and geotech bores give us the ground truth before a single line is drawn.
02
A federated BIM model — architecture, structure, MEP — clash-checked weekly with your team.
03
Sequencing, crane studies and temporary works planned to the hour, not the month.
04
Our own crews, fleet and formwork. No middle layers between the plan and the pour.
05
Commissioned, documented, and warranted — with a digital twin of everything we built.
Phase 06 — Portfolio
01 · 2025Mumbai · Commercial · 34 floors
₹ 1,240 Cr
02 · 2024Karnataka · Infrastructure · 1.8 km
₹ 860 Cr
03 · 2024Chakan · Industrial · 1.2M sq ft
₹ 410 Cr
04 · 2023Bengaluru · Residential · 412 homes
₹ 530 Cr
05 · 2023Maharashtra · Highway · 42 km
₹ 1,980 Cr
06 · 2022Hyderabad · Campus · 2.1M sq ft
₹ 1,120 Cr
About Ironridge

“We don't sub out the hard parts. If our name is on the hoarding, our crews are on the slab.”

Phase 07 — Handover